PROJECT CENTER

Planning and design of the whole plant
We only need to provide you with the factory plan, indicating the aluminum alloy melting casting project workshop, and we will design the most suitable melting casting process according to the overall layout of the company
2019-05-17
>
Equipment design
According to your capacity and enterprise positioning professional for you to design the most suitable for your casting equipment, the completion of the design to provide basic drawings of equipment construction;
2019-05-17
>
Equipment foundation construction
According to the basic design drawing of equipment, provide site construction guidance, including the reservation of POP points of water, electricity, gas and other public auxiliary facilities of the project.
2019-05-17
>
Foundation construction completed
After the completion of construction according to the construction drawings, the foundation is maintained. After the foundation is maintained, the construction conditions are reached. The equipment is completely manufactured on your site
2019-05-17
>
Furnace wall steel structure assembly
Experienced engineers make steel structures on the site. Once they are finished, they will be treated with anti-rust for the first time and then assembled. The manufacturing process and product quality can be seen and felt.
2019-05-17
>
Steel structure assembly completed
Complete the steel structure on site according to the design drawing; Then the second welding reinforcement, furnace bottom do (full welding) construction.
2019-05-17
>
Furnace bottom material construction
After the completion of the steel structure acceptance into the material construction process, to prevent the thermal expansion of the material crack construction using the whole precast block pouring construction method heat insulation layer construction, impermeable layer construction, working layer construction...
2019-05-17
>
Weld pool furnace wall material construction
According to the design index, the melt pool material is constructed in sections and layers (insulation layer construction, insulation layer construction, impermeable layer construction, working layer construction...
2019-05-17
>
Combustion system installation
After the completion of construction, into the combustion system installation: ignition system, fuel pipeline, combustion air duct, exhaust gas duct, energy-saving burner... After the installation of the overall cleaning, appearance painting treatment.
2019-05-17
>
Appearance painting construction
After the paint construction of the main part of the equipment, it goes into the fine painting process. According to the different functions of the equipment, the pipe valves represent different colors and carry out the fine painting work.
2019-05-17
>
Equipment debugging
After the completion of installation, the equipment shall be debugged. The system shall be debugged according to the functions of the equipment, and the system debugging report shall be issued. You can check and confirm one by one according to the debugging report.
2019-05-17
>
Installation of other equipment
After the completion of smelting equipment or at the same time to install and link other supporting equipment: environmental dust removal equipment, degassing filter equipment, heat preservation groove, continuous casting machine and other casting system equipment
2019-05-17
>

Contact us

Tel:0510-83798410

Fax:0510-83788410

Contact:Mr. Xie 15951502158

            Ms. Ruan 18951572159

Add:Rongsheng road, xishan district, wuxi city, jiangsu province, China

查看手机官网

官方微信

top