PROJECT CENTER

Planning and design of the whole plant
Weonlyneedtoprovideyouwiththefactoryplan,indicatingthealuminumalloymeltingcastingprojectworkshop,andwewilldesignthemostsuitablemeltingcastingprocessaccordingtotheoveralllayoutofthecompany
2019-05-17
>
Equipment design
Accordingtoyourcapacityandenterprisepositioningprofessionalforyoutodesignthemostsuitableforyourcastingequipment,thecompletionofthedesigntoprovidebasicdrawingsofequipmentconstruction;
2019-05-17
>
Equipment foundation construction
Accordingtothebasicdesigndrawingofequipment,providesiteconstructionguidance,includingthereservationofPOPpointsofwater,electricity,gasandotherpublicauxiliaryfacilitiesoftheproject.
2019-05-17
>
Foundation construction completed
Afterthecompletionofconstructionaccordingtotheconstructiondrawings,thefoundationismaintained.Afterthefoundationismaintained,theconstructionconditionsarereached.Theequipmentiscompletelymanufacturedonyoursite
2019-05-17
>
Furnace wall steel structure assembly
Experiencedengineersmakesteelstructuresonthesite.Oncetheyarefinished,theywillbetreatedwithanti-rustforthefirsttimeandthenassembled.Themanufacturingprocessandproductqualitycanbeseenandfelt.
2019-05-17
>
Steel structure assembly completed
Complete the steel structure on site according to the design drawing; Then the second welding reinforcement, furnace bottom do (full welding) construction.
2019-05-17
>
Furnace bottom material construction
Afterthecompletionofthesteelstructureacceptanceintothematerialconstructionprocess,topreventthethermalexpansionofthematerialcrackconstructionusingthewholeprecastblockpouringconstructionmethodheatinsulationlayerconstruction,impermeablelayerconstruction,workinglayerconstruction...
2019-05-17
>
Weld pool furnace wall material construction
According to the design index, the melt pool material is constructed in sections and layers (insulation layer construction, insulation layer construction, impermeable layer construction, working layer construction...
2019-05-17
>
Combustion system installation
Afterthecompletionofconstruction,intothecombustionsysteminstallation:ignitionsystem,fuelpipeline,combustionairduct,exhaustgasduct,energy-savingburner...Aftertheinstallationoftheoverallcleaning,appearancepaintingtreatment.
2019-05-17
>
Appearance painting construction
Afterthepaintconstructionofthemainpartoftheequipment,itgoesintothefinepaintingprocess.Accordingtothedifferentfunctionsoftheequipment,thepipevalvesrepresentdifferentcolorsandcarryoutthefinepaintingwork.
2019-05-17
>
Equipment debugging
After the completion of installation, the equipment shall be debugged. The system shall be debugged according to the functions of the equipment, and the system debugging report shall be issued. You can check and confirm one by one according to the debugging report.
2019-05-17
>
Installation of other equipment
Afterthecompletionofsmeltingequipmentoratthesametimetoinstallandlinkothersupportingequipment:environmentaldustremovalequipment,degassingfilterequipment,heatpreservationgroove,continuouscastingmachineandothercastingsystemequipment
2019-05-17
>